Utah contract template: what you are required to include, and how much deposit you can take

  • Free. The download links come by email.
  • Deepsel is our product: free estimate, invoice and scheduling software for contractors (scheduling and dispatch, quotes, invoicing, card payments). The section before the FAQ says where it fits and where it doesn't.
  • Not legal advice. Have a Utah attorney read the template before you use it.

I couldn't find a Utah law that makes you put a home improvement contract in writing, and Utah puts no cap on the deposit. Write one anyway. Once you do, Utah decides part of what's in it: your DOPL license number on every contract, and on a house or duplex someone lives in, a lien-protection notice whose wording comes from a state rule. Sell the job at the customer's home and you add a 3-day cancellation notice in 12-point bold on page one, plus the federal one by the signature. Hail and wind repairs bring two more. The deposit is whatever you and the owner agree, but once you take it you have to start on the date you promised, or within 30 days if you didn't promise one.

A contractor on Reddit put the risk of a generic form plainly: "just googling a contract and hoping for the best won't get one that's written specifically for the state he works in."18 Utah's state-specific part fits on two pages. The piece most forms get wrong is the lien notice, because its wording sits in an administrative rule rather than the statute; even the optional contract DOPL publishes summarizes it instead of quoting it. I read the Construction Trades Licensing Act, the lien statutes and their DOPL rules, the Consumer Sales Practices Act, the storm-repair chapter and the federal cooling-off rule on November 3, 2026. One date to know: on January 1, 2027 most of the licensing act gets new section numbers, because the 2026 Legislature rewrote it. The rules below carry over with the same substance, and I give both numbers.

The template has all of it in the required wording. Get it three ways: make your own copy in Google Docs (opens in your Drive), download the Word version (.docx), or download the PDF. Pick a format, enter your email and I'll send the links.

Does this apply to you?

Two things decide which rules reach your contract: what you're working on, and where the customer signs.

  • Any job that needs a license, residential or commercial: your license number goes on the contract.1
  • A house or duplex someone lives in, when you contract with the owner directly: the lien-protection notice. Utah calls you the "original contractor" and the home a "residence": a detached single-family home or a duplex that the owner or their tenant lives in, or will within 180 days after you finish, as a primary or secondary residence. The work can be anything from "designing, engineering, constructing, altering, remodeling, improving, repairing, or maintaining." Subcontractors don't owe the notice, and a fourplex or a commercial building isn't a "residence."24
  • Signed anywhere but your place of business, for a homeowner's personal or household use: the 3-day cancellation notices, Utah's for sales over $25 and the federal one for $25 at the home or $130 elsewhere.810
  • Wind or hail damage to a roof, siding, gutters or windows on a home of up to four units: the storm-repair notices.12

By trade

General contractors, remodelers, roofers, electricians, plumbers and HVAC contractors are all licensed under the same law, the Utah Construction Trades Licensing Act, so Utah's contract rules don't split by trade the way they do in states that keep electricians and plumbers out of home-improvement registration. Electrical, plumbing and HVAC shops hold contractor classifications under the same DOPL rule as general contractors: E200 and E201 for electrical, P200 and P201 for plumbing, and H100 for HVAC, which took over from the S350 license in 2026.14 Here's what each one needs:

You areLicense number on the contractLien notice (house or duplex)3-day noticesWind and hail notices
General or residential contractor (B100, R100)YesYesWhen signed away from your officeWhen you repair wind or hail damage to a roof, siding, gutters or windows
Remodeler or specialty contractor (R101, S220 carpentry and flooring, S260 asphalt and concrete, other S classes)YesYesWhen signed away from your officeSiding and window jobs after a storm
Roofer (S280)YesYesWhen signed away from your officeYes, on every wind or hail repair, and the deductible notice when insurance pays
Electrical contractor (E200, E201)YesYes, repairs and service calls includedWhen signed away from your officeRarely
Plumbing contractor (P200, P201)YesYes, repairs and service calls includedWhen signed away from your officeRarely
HVAC contractor (H100, formerly S350)YesYes, repairs and maintenance includedWhen signed away from your officeRarely
Unlicensed handyman under the $7,000 exemptionNo license to listYes: the rule covers exempt contractors tooWhen signed away from your officeWhen the job is a wind or hail repair

Service calls count. The lien notice covers repairing and maintaining a home, so a furnace repair or a water heater swap at a house is "construction on an owner-occupied residence."4 If the customer signs your quote or your work order, that's the contract, and the notice belongs in its terms. The handyman row is narrow: the exemption covers jobs under $7,000 including changes, and plumbing, electrical and HVAC work on those jobs still has to be done by licensed contractors.15

What your Utah contract must include

Your DOPL license number, on every contract

Utah Code 58-55-304 is one sentence: "The contractor's license number shall be made a part of all permit applications, contracts, agreements, or bids when a license is required." From January 1, 2027 the same rule is 58-55-107(3), which adds that DOPL "may consider" a failure to comply unprofessional conduct.1 Put it in the parties block on page one and on every quote. Sample wording: "Utah DOPL contractor license # [number], classifications R100 and S280."

On a house or duplex: the lien-protection notice

This is the one Utah-specific clause every residential contract needs. The statute, 38-11-108, says "the original contractor or real estate developer shall state in the written contract with the owner what actions are necessary for the owner to be protected" from liens and lawsuits over unpaid work.2 DOPL's rule R156-38a-108 then writes the notice for you and says it "shall prominently appear in an easy-to-read type style and size in every contract between an original contractor and homeowner."3 It opens with "X. PROTECTION AGAINST LIENS AND CIVIL ACTION." The X is your section number.

In plain words, the notice tells the owner that your subcontractors and suppliers can't lien the house or sue them over your unpaid bills if either (1) they signed a written contract with a licensed (or exempt) contractor and "paid in full the contracting entity in accordance with the written contract and any written or oral amendments," or (2) the whole contract is $5,000 or less. The owner locks that in by applying to DOPL for a Certificate of Compliance.34

Here's why it matters to you too. The Residence Lien Recovery Fund used to pay the subs and suppliers who lost their lien this way. DOPL says the Legislature stopped funding it in 2018, its balance "has been exhausted," and it "is currently unable to pay new claims."5 So when you don't pay a supplier on a fully paid job, the supplier can't go after the house and the fund won't pay. They come after you. The template's Section 6 has the notice word for word. Leaving it out is unlawful conduct under the licensing act, and the fines are in the section on getting it wrong.

Signed at the customer's home: a 12-point notice on page one

Utah's Consumer Sales Practices Act makes it a deceptive practice to skip a cancellation notice on a "direct solicitation sale" over $25, meaning one made "other than at the supplier's established place of business pursuant to the supplier's personal contact, whether through mail, electronic mail, facsimile transmission, telephone, or any other form of direct solicitation." The notice must be "a conspicuous statement written in dark bold with at least 12-point type on the first page of the purchase documentation" and read:8

YOU, THE BUYER, MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THE TRANSACTION OR RECEIPT OF THE PRODUCT, WHICHEVER IS LATER.

The statute lets you write a longer period in place of "the third business day" if your own policy gives one, never a shorter one. The federal rule adds its own statement next to the signature and a separate cancellation form. Both are in the cancellation section below, and the template has all three.

Wind and hail repairs: two more notices

Utah Code chapter 13-50 covers "any work done to siding, gutters, a roof system, or a window system to repair damage caused by wind or hail" on a home of up to four units.12 Two rules come with it:

  • Every written repair contract, insurance or not, needs a notice that the owner can cancel within five business days after their insurer denies the claim (if you "knew or should have known" insurance would pay), the mailing address where you receive notices, and "a detachable copy of a notice of cancellation." The statute gives the wording for both.12
  • When insurance pays any part of it, every contract, estimate and work order needs a notice in capitals of at least 14 points that rebating the deductible is illegal and that "THE INSURED POLICY HOLDER IS PERSONALLY RESPONSIBLE FOR PAYMENT OF THE DEDUCTIBLE." And "no payment may be made to the residential contractor until" the named insured signs that notice and you deliver it to their insurance company.12

The template's Section 10 and Appendices B and C carry the exact text.

What else belongs in the contract

DOPL put the reason for the rest bluntly: it and the Division of Consumer Protection "often receive complaints about violations of construction work, then learn that no agreement exists or the agreement lacks the specificity to make clear what the expectations are under the contract."17 None of the following is required wording, but each one heads off a complaint:

  • The work, room by room or system by system, and the materials by brand, model and color.
  • A start date and a completion date. The start date does legal work in Utah (see the deposit section).
  • The price, and a payment schedule tied to milestones.
  • Change orders in writing, signed before the changed work starts. The owner's lien protection depends on paying in full under the contract "and any amendments," so the change orders are their record too.4
  • Who gets the permits, the warranty, your insurance, how notices are sent, and signatures.

How much deposit can a contractor ask for in Utah?

There's no cap. I looked through the Construction Trades Licensing Act (current and as rewritten for 2027) and DOPL's rule under it, the residence lien chapter and its rule, the construction lien chapter, the Consumer Sales Practices Act, the storm-repair chapter and the home solicitation chapter. None of them limits the deposit or says how you must hold it: no trust account, no escrow, no separate bank account.614 DOPL's own optional contract leaves the initial payment blank and says only that the contractor credits it toward the price and refunds "any part of the initial payment not used for the Project."17

So when a contractor asks "are you allowed legally to charge that much deposit?",19 the Utah answer is yes. The rules that bite come after you take the money:

  • Start when you said you would. After "receipt of payment," failing to furnish the services "within the time advertised or otherwise represented or, if no specific time is advertised or represented, ... within 30 days" is a deceptive practice, unless before that deadline you offer the customer the choice to cancel with a full refund within 10 business days, or a new start date you propose.8 Write a start date in every contract. Section 2.4 of the template makes the offer for you.
  • Use it on that job. Taking money "in payment for a specific project" and then failing to pay the people who did the work or supplied materials "within a reasonable period of time" is unlawful conduct. It's an infraction, and theft if you meant to keep the money.6 From 2027 the same rule is 58-55-601(13) and 602(2).7
  • Don't walk away. "Abandonment or failure to complete a project without the consent of the owner" is unprofessional conduct, which DOPL can discipline your license for.6
  • Refund fast after a cancellation. Ten business days under the federal rule, and the same after a storm-repair cancellation, where you return "all payments, partial payments, deposits."1012
  • No deposit at all on insurance-paid storm work until the deductible notice is signed and delivered to the insurer.12

I found no Utah statute written for the contractor who takes a deposit and never starts. The 30-day rule makes it a deceptive practice unless you offer the refund, abandoning the job is grounds for discipline, and past that it's the general law of contracts and theft.

How to set the payment schedule

Size the deposit to the special-order materials and the first days of work. On a job signed at the customer's home, either take the deposit after the three business days are up, or take it at signing and treat it as refundable until then (and don't order the special-order cabinets on day one). Tie each progress payment to something the owner can see. Make the final payment due at completion, and hand over a paid-in-full receipt with it: DOPL asks the owner for proof of full payment when they apply for the Certificate of Compliance,5 and a clean receipt means one less phone call to you.

Cancellation: Utah's 3-day rule and the FTC rule

Two rules apply to most contracts signed at the customer's home, and a third applies if you finance jobs yourself:

 Utah Consumer Sales Practices ActFTC Cooling-Off RuleUtah home solicitation sales (credit)
Applies toA "direct solicitation sale" over $25 made away from your established place of business after you contacted the customer, in person or by mail, email or phoneA sale of $25 or more at the buyer's home, or $130 or more at another temporary location, including when the buyer invited youA consumer credit sale you solicited face to face at the buyer's home or workplace (you charge a finance charge, or take more than four installments after the down payment)
NoticeThe 12-point dark bold statement on page oneA 10-point bold statement next to the buyer's signature, two copies of the Notice of Cancellation, and telling them out loudA statement under the caption "BUYER'S RIGHT TO CANCEL"; the FTC wording counts
EmergenciesNo exception in the statuteBuyer-initiated emergency, with a dated, signed, handwritten waiverNo cancellation if the buyer asked you to start without delay because of an emergency
RefundNot stated for this noticeWithin 10 business daysWithin 10 days; services done before the cancellation earn nothing

The federal rule's statement goes "in immediate proximity to the space reserved in the contract for the signature of the buyer ... in bold face type of a minimum size of 10 points": "You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right." The Notice of Cancellation goes with it in duplicate, and you have to tell the buyer about the right out loud. A federal business day is any day except Sunday and federal holidays.10 Utah's statute doesn't define a business day, so I count the three days skipping Saturdays too; that never ends earlier than either rule. The federal rule leaves stronger state laws in place, so you follow both.10

The credit rule only matters if you carry the financing yourself. Utah's Consumer Credit Code accepts the FTC notice as its wording, and the template puts the "BUYER'S RIGHT TO CANCEL" caption in the signature box so you're covered either way.11

When the 3-day rules don't apply

  • The customer signs at your office or showroom. Neither notice is needed.
  • The customer called you to repair or maintain their "personal property" (an appliance, for example). The federal rule excludes that visit, but not anything extra you sell during it. Utah's statute has no matching exclusion, and I'd treat equipment that's part of the house as covered.10
  • A real emergency the customer called you about. The federal rule lets them waive the three days only with "a separate dated and signed personal statement in the buyer's handwriting." Utah's statute has no emergency exception, and it doesn't define "direct solicitation." A job the customer started by calling you may fall outside it, but I found nothing that says so. Ask your attorney before you rely on that.810

My advice for a small shop: put the page-one box, the signature statement and the two forms on every residential contract that isn't signed at your office. It costs a page, and it closes the question.

Other notices and paperwork

Utah preliminary notice and the lien deadline

Your own lien rights run through the State Construction Registry. File a preliminary notice there "no later than 20 days after the day on which the person commences providing construction work." Miss it and you "may not claim a construction lien" (a late notice only covers work from five days after you file it). If you're not paid, record your notice of construction lien within 180 days after "final completion" (the certificate of occupancy, the final inspection, or the day no substantial work remains, not simply your last day on site), or within 90 days after a notice of completion is filed, whichever comes first.13 On an owner-occupied home, that lien notice has to describe the steps the owner can take to have it removed, and DOPL's rule puts the same Section 6 notice in it.313

If a customer hasn't paid, the Utah mechanics lien guide has the steps, every deadline and a demand letter.

Roofers and assignments of insurance benefits

If a homeowner assigns you their insurance benefits after a storm, that's a separate document with its own rules: an itemized description of the work, the total price, "a statement that the residential contractor has made no assurances that an insurance contract will fully cover the claimed loss," a 14-point capitalized notice, and delivery to the insurer within five business days. Break any rule in that part of the chapter and the assignment is void. No deductible rebates either, ever.12 I left the assignment out of the template on purpose. Have an attorney write it.

What happens if you get it wrong

  • No lien notice in a residential contract: unlawful conduct under Utah Code 58-55-501(18) and unprofessional conduct under 58-55-502(4)(e). DOPL can cite you with a fine of up to $1,000 for a first offense, up to $2,000 for a second, and up to $2,000 a day after that, and a citation is grounds for immediate license suspension.6 From 2027 the sections are 58-55-601(16), 603(4)(e) and 604, with the same fines.7
  • No license number: I found no separate penalty in the current act. From 2027, DOPL "may consider" it unprofessional conduct.1
  • No 3-day notice, or a late start after taking money: both are deceptive practices under the Consumer Sales Practices Act. The customer can sue for actual damages plus court costs, the court can award attorney fees, and the Division of Consumer Protection can fine you up to $2,500 per violation.9 The FTC treats a missing federal notice as an unfair and deceptive practice.10
  • Financing in-house without the credit notice: the buyer can cancel by any means until you give it, and services you did before a cancellation earn nothing.11
  • Insurance-paid storm work without the signed deductible notice: you can't be paid. An assignment of benefits that breaks the chapter is void.12
  • Job money not paid to that job's workers and suppliers: an infraction, or theft if you meant to keep it.6
  • No preliminary notice within 20 days: a late notice only covers work from five days after you file it, so no lien for the work before then.13
  • Working without the right license: you can't sue to collect for work that needs one.16

The Utah contract template

It's a full residential construction contract built around the rules above:

  • The Utah 3-day statement in a 12-point bold box on page one, and the parties block with your DOPL license number and classifications.
  • Scope, materials, permits, start and completion dates, and Section 2.4, which handles the 30-day rule if you can't start on time.
  • A payment schedule with a deposit line (no Utah cap, with a note on sizing it), refunds within 10 business days, and no payment on insurance-paid work until the deductible notice is done.
  • Written change orders, and Section 6, the lien-protection notice word for word from rule R156-38a-108.
  • The preliminary notice, license and insurance, a workmanship warranty, and Section 10 for wind and hail repairs.
  • Signatures with the federal statement and the "BUYER'S RIGHT TO CANCEL" caption, then Appendix A (the FTC Notice of Cancellation, two copies), Appendix B (the storm-repair cancellation form), Appendix C (the deductible notice for the insurer), Appendix D (a change order) and Appendix E (Utah notes for you, which you remove before handing it over).

Download it: copy it into Google Docs, get the Word file, or the PDF.

Where Deepsel fits

Deepsel is free estimate, invoice and scheduling software for contractors. You write quotes with options, and a shop-wide terms text you set once is copied onto every quote, so the Utah clauses from this template (the lien notice, the 3-day statement, your license number) can sit there. The customer approves the quote online and signs it on screen. You can ask for a deposit, a percent or a fixed amount, which they pay by card when they approve, and the deposit is credited on the final invoice. On Pro, this Utah contract is built in. Attach it to the estimate, and the customer reads it on the quote page, notices and cancellation forms included, and signs it when they approve; your saved signature goes on when you send, and you both get the signed copy to print or save as PDF. Template, not legal advice. Have it reviewed for your business. Deepsel doesn't know Utah law, though. The terms text alone won't add the notices or the detachable cancellation forms, and Deepsel won't hold back a deposit on an insurance job until the deductible notice is signed; it collects the card deposit the moment the customer approves. The Free plan covers 30 estimates and 30 invoices a month for your whole team, with scheduling and dispatch, quotes, invoicing, card payments, and customer and equipment records; Pro is $29 a month with unlimited estimates and invoices. Details are on the pricing page.

Free up to 30 estimates and 30 invoices a month, then $29 a month for your whole team. No credit card required.

Frequently asked questions

How much deposit can a contractor ask for in Utah?

Utah sets no limit. I found no cap in the Construction Trades Licensing Act or its DOPL rule, the lien statutes, the Consumer Sales Practices Act, the storm-repair chapter or the home solicitation chapter, and DOPL's own optional residential contract leaves the initial payment blank. What Utah does regulate is what happens after you take the money: you must start by the date you promised (or within 30 days if you promised none) unless you offer a refund or a new date, the money has to pay the workers and suppliers on that job, and on an insurance-paid storm repair you can't take any payment until the owner has signed the deductible notice and you've sent it to the insurer.

How much do contractors usually ask for a deposit?

There's no Utah standard to point to, because the law leaves it to you and the owner. My rule: size the deposit to the special-order materials and the first days of work, then tie every other payment to something the owner can see, like materials on site, a passed rough-in inspection, or the final walk-through. A small deposit and milestone payments keep you funded without asking the owner to trust you with money you haven't earned yet.

Is it normal for a contractor to take a deposit?

Yes. Utah's own optional Residential Construction Agreement, published by the Division of Professional Licensing in 2025, has an initial payment line that the contractor credits toward the total and refunds if it isn't used on the project. On a job signed at the customer's home, expect to refund it if they cancel within three business days, and don't order special-order materials until that period is over.

Does Utah require a written contract for construction work?

I found no Utah law that makes every residential job put its contract in writing. In practice you want one. The license number and the lien-protection notice have to be in your contracts, the 3-day cancellation rules require written notices when you sell at the home, and a homeowner with a job over $5,000 only gets Utah's protection from your subcontractors' and suppliers' liens with a written contract they paid in full. DOPL says it often gets complaints where no agreement exists.

Is there a 3-day right to cancel a contractor contract in Utah?

Yes, when the sale is made away from your place of business after you contacted the customer, and the price is over $25. Utah's Consumer Sales Practices Act requires a set statement in dark bold 12-point type on the first page, and the federal Cooling-Off Rule adds a statement next to the customer's signature and two copies of a Notice of Cancellation for sales of $25 or more at the home. If the customer cancels, refund every payment within 10 business days. A contract signed at your office isn't covered.

Does Utah have an official contractor contract template or PDF?

DOPL publishes an optional Residential Construction Agreement (May 2025) with exhibits for plans, change orders and proof of license and insurance. It's a good read. It has no 3-day cancellation notices and no storm-repair notices, and its lien section summarizes the owner's protection instead of using the notice wording in rule R156-38a-108, so check those parts if you use it. The template on this page has all of them.

Is there a Google Docs, Word or PDF version?

All three, and all of them free. The Google Docs link makes a copy in your own Drive, the .docx opens in Word, and the PDF prints as is. The boxed notices keep their bold type in every format.

Sources

  1. Utah Code 58-55-304(2), current until December 31, 2026: "The contractor's license number shall be made a part of all permit applications, contracts, agreements, or bids when a license is required." le.utah.gov. Utah Code 58-55-107(3) and (5)(b), effective January 1, 2027 (2026 General Session, chapter 42): "The division shall require the contractor's license number on permit applications, contracts, agreements, or bids that require a license"; "The division may consider a qualifier or contractor's failure to comply with the requirements of this section to be unprofessional conduct." le.utah.gov. Both read November 3, 2026.
  2. Utah Code 38-11-108(1), Notification of rights under chapter: "the original contractor or real estate developer shall state in the written contract with the owner what actions are necessary for the owner to be protected under Section 38-11-107 from the maintaining of a mechanic's lien or other civil action." le.utah.gov, read November 3, 2026.
  3. Utah Administrative Code R156-38a-108, Notification of Rights under Title 38, Chapter 11 (rule R156-38a effective June 25, 2026): the notice "shall prominently appear in an easy-to-read type style and size in every contract between an original contractor and homeowner and in every notice of intent to hold and claim lien filed under Section 38-1a-502," with the full text of "X. PROTECTION AGAINST LIENS AND CIVIL ACTION." adminrules.utah.gov, read November 3, 2026.
  4. Utah Code 38-11-102 (definitions: "construction on an owner-occupied residence" includes "repairing, or maintaining"; "original contractor"; "owner-occupied residence," occupied "as a primary or secondary residence within 180 days"; "residence," a detached single-family dwelling or "a multifamily dwelling up to and including duplexes"), 38-11-107 (lien bar; $5,000 general contracts) and 38-11-204(4) (written contract with a licensed or exempt contractor, paid "in full ... in accordance with the written contract and any amendments"). le.utah.gov, read November 3, 2026.
  5. Utah Division of Professional Licensing, "Residence Lien Recovery Fund - General Information": owners with contracts over $5,000 must "Have a written contract with a licensed contractor" and "Provide proof that you paid the contractor or other qualified party in full"; "In 2018, the Utah Legislature discontinued collection of these fees ... the fund's available balance has been exhausted. The LRF is currently unable to pay new claims." commerce.utah.gov, read November 3, 2026.
  6. Utah Code 58-55-501 (unlawful conduct: (13) project funds, (18) "failing, as an original contractor ... to include in a written contract the notification required in Section 38-11-108"), 58-55-502(4) (unprofessional conduct: (a) "abandonment or failure to complete a project without the consent of the owner," (e) failure to provide the 38-11-108 information) and 58-55-503 ((3) infraction, or "theft under Section 76-6-404"; (4)(a) immediate suspension; (5)(h) fines "up to $1,000," "up to $2,000," "up to $2,000 for each day of continued offense"). All current until December 31, 2026. le.utah.gov, read November 3, 2026.
  7. Utah Code 58-55-601(13) and (16), 58-55-602(2), 58-55-603(4) and 58-55-604(5) and (10), effective January 1, 2027 (repealed and re-enacted by 2026 General Session, chapter 42): the same unlawful-conduct, infraction and theft, unprofessional-conduct, fine and suspension rules under new numbers. le.utah.gov, read November 3, 2026.
  8. Utah Consumer Sales Practices Act, Utah Code 13-11-4(2)(l) (services not furnished "within 30 days" after payment unless the buyer gets the option to cancel with a refund "within 10 business days" or a new date), (2)(m) (direct solicitation sale over $25 "other than at the supplier's established place of business") and (3) (the notice "in dark bold with at least 12-point type on the first page," its wording, and the exemption for a policy that "offers greater rights"). le.utah.gov, effective May 6, 2026, read November 3, 2026.
  9. Utah Code 13-11-19(2) and (5) (a consumer "may recover actual damages plus court costs"; attorney fees when "a supplier has committed an act or practice that violates this chapter") and 13-11-17(4)(a) ("an administrative fine of up to $2,500 for each violation"). 13-11-19 and 13-11-17, le.utah.gov, read November 3, 2026.
  10. Federal Trade Commission, Rule Concerning Cooling-Off Period for Sales Made at Homes or at Certain Other Locations, 16 CFR Part 429: 429.0 ($25 at the buyer's residence, $130 elsewhere, "including those in response to or following an invitation by the buyer"; the emergency and personal-property repair exclusions; business day is "any calendar day except Sunday or any federal holiday"), 429.1 (statement, Notice of Cancellation in duplicate, oral notice, refund within 10 business days, "unfair and deceptive act or practice"), 429.2(b) (state laws stand unless directly inconsistent). ecfr.gov, read November 3, 2026.
  11. Utah Code 70C-5-101 to 70C-5-105, Home Solicitation Sales ("a consumer credit sale ... at a residence or place of employment of the buyer"; the "BUYER'S RIGHT TO CANCEL" caption; FTC compliance "is deemed compliance"; the emergency exception; refund "within 10 days"; "the seller is entitled to no compensation" for services before a cancellation), and 70C-1-302(4) (creditor: credit "subject to a finance charge or ... payable by written agreement in more than four installments, not including a down payment"). le.utah.gov, read November 3, 2026.
  12. Utah Code chapter 13-50, Residential Construction Contracts: 13-50-102 ("repair work" on "siding, gutters, a roof system, or a window system" damaged by wind or hail; residential building "of up to four units"), 13-50-202 (cancellation after an insurance denial; return of "all payments, partial payments, deposits" within 10 business days), 13-50-203 (required contract notice, mailing address and detachable Notice of Cancellation), 13-50-301 (post-loss assignments), 13-50-302 (no deductible rebates), 13-50-303 (14-point capitalized deductible notice; "no payment may be made to the residential contractor until" it is signed and delivered to the insurer), 13-50-304 (assignment void). le.utah.gov, read November 3, 2026.
  13. Utah Code 38-1a-501 (preliminary notice "no later than 20 days after the day on which the person commences providing construction work"; late notices; "may not claim a construction lien") and 38-1a-502 (notice of construction lien within 180 days after final completion, or 90 days after a notice of completion; owner-occupied residence statement). le.utah.gov, read November 3, 2026.
  14. Utah Administrative Code R156-55a, Utah Construction Trades Licensing Act Rule (effective August 7, 2026): contractor classifications in R156-55a-301 (B100, R100, E200, E201, P200, P201, H100 with S350 licenses "deemed to hold an H100-HVAC Contractor license," R101, S220, S260, S280) and R156-55a-501, unprofessional conduct, which has no contract-content or deposit rule. adminrules.utah.gov, read November 3, 2026.
  15. Utah Code 58-55-305(1)(h), exemptions from licensure: work "with a contracted or agreed value of less than $7,000, including both labor and materials, and including all changes or additions"; plumbing, electrical and HVAC work on such projects by licensed contractors; an insurance affirmation over $3,000. le.utah.gov, effective May 7, 2025, read November 3, 2026.
  16. Utah Code 58-55-604, Proof of licensure to maintain or commence action: a contractor may not "commence or maintain any action in any court of the state for collection of compensation" for licensed work without proving it was licensed when the contract was entered into (58-55-210 from January 1, 2027). le.utah.gov, read November 3, 2026.
  17. Utah Division of Professional Licensing, "Construction Contract" (Residential Construction Agreement, optional, dated May 29, 2025): DOPL and the Division of Consumer Protection "often receive complaints about violations of construction work, then learn that no agreement exists or the agreement lacks the specificity to make clear what the expectations are under the contract"; section 3.2, Initial Payment, credited toward the total, with a refund of "any part of the initial payment not used for the Project." commerce.utah.gov and the agreement PDF, read November 3, 2026.
  18. r/Contractor thread: "just googling a contract and hoping for the best won't get one that's written specifically for the state he works in." reddit.com.
  19. r/GeneralContractor thread: "are you allowed legally to charge that much deposit?" reddit.com.

Put the Utah terms on every quote.

Paste the lien notice and the 3-day statement into your quote terms once, send quotes the customer approves and signs on screen, and take a card deposit at approval. Free up to 30 estimates and 30 invoices a month; Pro is $29 a month for unlimited estimates and invoices. No card required.