Your Louisiana electrical contractor license: what it lets you do and your first 30 days

  • Free. The whole 30-day checklist is on this page. The printable version (PDF, Word or Google Docs) comes by email.
  • Deepsel is our product: free estimate, invoice and scheduling software for contractors (scheduling, quotes, invoicing, card payments). The section before the FAQ says where it fits and where it doesn't.
  • Not legal advice. Every rule here links to the statute, rule, board form, city page or utility standard it comes from. Call the LSLBC (225-765-2301) or a Louisiana attorney before you bet a job on my reading.

Your license belongs to the business, and its line is $10,000. The State Licensing Board for Contractors (LSLBC) Electrical classification lets your company bid and do electrical work worth $10,000 or more, labor and materials counted together, on houses as well as commercial buildings, anywhere in Louisiana.1 There is no statewide master or journeyman license. New Orleans, Jefferson Parish and other cities license electricians themselves, and on jobs under $10,000 their rules are the ones that apply.2,22,23 The state sets no insurance or bond minimum for your classification, but New Orleans wants $500,000 of liability coverage before it licenses you, and the utilities connect a service only after the inspection passes.12,22,27

If your license reads Telecommunications, Low Voltage instead, you hold a subclassification of Electrical with no exam behind it. It covers "all low voltage electrical applications" over $10,000 and no line-voltage job of that size.11

A Louisiana electrician asked the question this page answers on r/electricians in December 2024: "In Louisiana, all you have to do to become a licensed electrical contractor is pass this exam with the state license if board." Then: "What exactly does this license I have allow me to do now?" One reply told him the license was "required to do jobs $50K +" (r/electricians). That's the line for general commercial work. The electrical line is $10,000. The pages that rank for "louisiana electrical contractor license" are about passing the exam, and on the day I checked, Google's AI answer quoted a $10,000 net worth where the statute and the board's form say $50,000. This page starts the day after the license arrives. The general rules for remodelers and builders are in Louisiana contractor license requirements, and what a written contract must contain is in the Louisiana contract template.

What the Louisiana electrical contractor license covers

The board keeps the Electrical classification on its commercial license roster, which is why your license says "commercial." It isn't commercial-only. The statute's electrical contractor works on "any residential, commercial, or other project" and needs the classification when "the project value is ten thousand dollars or more."1 Project value is "the entire cost of the labor, materials, rentals, and all direct and indirect project expenses," counted "regardless of who pays the costs."1 A $7,000 labor quote on a job where the customer buys $3,500 of fixtures is a $10,500 job. Splitting it into two contracts doesn't help either: the board treats the parts as one contract.5

A small wrinkle. The board's rule and its classification page say a license is required when the value "exceeds $10,000," and the statute says "$10,000 or more."1,10,11 At exactly $10,000, go with the statute.

ClassificationWhat it coversLicense needed from
Electrical (a major classification)"Wiring, cabling, fixtures, appliances, equipment, and/or hardware for the supply of electricity to any structure, building, or project." Low-voltage and fiber work count as Electrical whenever any of it goes through walls, ceilings, floors, closed spaces or the building envelope, including pulling cable through existing pathways. Plugging equipment into an existing outlet isn't licensed work.$10,000 (statute); "exceeds $10,000" (rule)
Telecommunications, Low Voltage (subclassification of Electrical)"All low voltage electrical applications." No examination or credential required.Over $10,000
Electrical Controls, Instrumentation and Calibration (subclassification of Electrical)Controls, including "HVAC controls, 'Smart house' controls, security alarm panels, fire alarm panels"Over $10,000
Electrical Transmission Lines (subclassification of Electrical and Heavy Construction)Utility transmission and distribution lines, poles, towers and substationsOver $10,000
Solar Energy Equipment (a separate license, added on top of Electrical, Building Construction, Mechanical or Residential Construction)Solar photovoltaic and solar thermal systems$10,000

Sources for the table: the definitions and the solar section of the statute,1,3 the board's classification rule10 and its classification pages.11

Electrical is a major classification, and a major classification lets you "estimate, bid, quote, and perform any scope of work included in any of its subclassifications."10 So an Electrical license already covers the low-voltage, controls and transmission scopes. It doesn't run the other way: a Telecommunications holder can't take a $15,000 line-voltage job. Solar is its own license (below). Signs have no state classification; wiring one is electrical work, and New Orleans adds $40 per sign to the electrical permit.22

Louisiana electrical license vs master electrician license: the state licenses the company, cities license the people

Louisiana's contractor law has no statewide master or journeyman electrician license. A reply in the same Reddit thread summed it up: "Louisiana doesn’t have a journeyman or masters license. Just the state contractors. Some parishes have their own lil test ( or at least my small town did)" (r/electricians, December 17, 2024). The statute says the same in its own way. It lets parishes and cities require "licenses ... for the purpose of determining the competency of mechanical, electrical, or plumbing contractors," and Act 757 of 2026 added electrical contractors to that exception by name.2,4

  • New Orleans licenses Class A electrical contractors (the master), Class C maintenance electricians, Class D journeymen and Class E trainees, and an electrical permit there "can only be obtained by an electrical contractor with a Class 'A' Electrical License from the City."22
  • Jefferson Parish requires "a Jefferson Parish licensed electrician" to file for "electrical service panels, light fixtures, ceiling fans, switches, outlets, etc."23
  • Shreveport requires a contractor's registration before anyone does electrical work in the city.25

Here's the part that works for you. Electrical contractors licensed by the state "are excluded from local, municipal, or parish regulatory authority examination procedures and may bid and perform work within any local jurisdiction upon paying all appropriate fees." Your employees are covered too: no parish or city may require them to pass its exam or hold its certification "as a condition to performing work" for you.2 The board's statute repeats that it preempts "any municipal or other local regulatory examination authority over all licensees."7 New Orleans already works this way for the company license: it takes a copy of your "State License (Statewide) and qualifying party letter" in place of its ICC exam.22 So you don't retest city by city. You register and pay.

Most service calls, panel swaps and EV circuits come in under $10,000, so for them the local license is the one that matters. Outside the big cities, call the permit office before your first job there.

Your qualifying party, your crew and who may work alone

The license belongs to the business: "a limited liability company license belongs to the limited liability company," whatever happens to the person who passed the exam.10 That person is your qualifying party, and each classification needs one. It has to be an owner or a full-time employee, which the board's rule defines as at least 32 hours a week and an employee by IRS standards.2,10 If your qualifying party leaves, the license stays valid, but you may not begin new work in that classification until someone replaces them. Tell the board within 30 days and qualify the replacement within 60.2,10 The contractors law sets no apprentice ratio and doesn't say who may work alone; I found neither in the board's law book. Your employees need no license of their own to work for you, and no local exam or certification either.2,4 New Orleans still issues journeyman and trainee licenses and allows one Class A holder per company, so ask its Safety and Permits department how it applies the state rule to your crew before your first job there.22 Letting someone else work under your license is its own violation: "permitting a license to be used for any purpose by any person other than the person to whom the license is issued."5 One electrician on r/electricians put the cost plainly: "You could end up behind bars because of someone else’s mistake made under work done in your name" (r/electricians, July 2026).

Where your license stops

Your classification covers electrical work. These jobs touch something else, and each has its own rule.

Gas for a standby generator

The wiring, the transfer switch and the circuits are yours. The gas line isn't. Natural gas piping is "gas fitting," and the State Plumbing Board requires "any person performing work as a gas fitter or master gas fitter" to hold its license, at any price.17 One narrow carve-out: "piping connection, disconnection, or reconnection from the outlet side of the appliance shutoff valve to the appliance inlet" isn't gas fitting.17 So a licensed gas fitter runs the line and sets the valve, and the hookup from that valve to the generator falls outside the gas license (check whether your parish lets you file for it). Propane belongs to another agency. Installing LP gas systems or LP appliances takes a permit or registration from the Liquefied Petroleum Gas Commission, and the registration is open only to master plumbers and mechanical contractors.18 On January 1, 2027 the plumbing board is abolished and its licensing moves to the LSLBC under Act 908.17

Two generator rules are yours. "Professional installers who install generators in one- or two-family dwellings shall include with installation of a home generator, at minimum, an operable carbon monoxide detector with a long-life, sealed battery."19 And Louisiana's version of the electrical code requires permanently mounted residential generators to meet the manufacturer's instructions, with carbon monoxide alarms added.21 Put the detector in the quote.

Plumbing

Plumbing on someone else's property takes a State Plumbing Board license at any price. From January 1, 2027 it takes an LSLBC plumber's license, which Act 908 requires for "any plumbing work of any kind."17 A water heater's circuit is yours. Its pipes aren't.

HVAC equipment and the condenser circuit

Mechanical work (air conditioning, refrigeration, heating, ventilation, gas piping) needs the LSLBC Mechanical classification from $10,000.1 Your side is the circuit, the disconnect and the whip, on your electrical permit. Setting the unit and the refrigerant work are the mechanical contractor's. Jefferson Parish requires a "Jefferson Parish licensed mechanical contractor" to file for "replacement or installation of air conditioning, and heating equipment."23 Anyone who opens the refrigerant circuit needs EPA Section 608 certification.32 One Louisiana code change helps you here: GFCI protection "shall not be required on HVAC equipment."21

Fire alarm, security, cameras and access control

The State Fire Marshal licenses these, not the LSLBC. No one may do "life safety and property protection contracting" without a Fire Marshal license, and that covers installing, programming, selling and servicing fire alarm and security systems, cameras and special locking.20 A 2020 law carves out a lane for you. A firm with the LSLBC classification of "electrical work statewide" may "install wire, conduit, or other wire raceways, its associated boxes or fittings, and fire alarm initiating and notification devices or intrusion alarm systems or closed circuit television systems or special locking systems" without a Fire Marshal license. What's left out: "final termination in a fire alarm control panel, security control panel, access control panel, or closed circuit television systems controls." And electrical contractors may not "certify, inspect, or service" any of these systems. The carve-out doesn't apply to wireless systems.20 Rough in, then hand the panel to a licensed alarm firm.

It works the other way too. An alarm licensee "shall not install primary power sources of one hundred volts or greater" for a low-voltage system unless licensed by the LSLBC, so alarm companies need an electrician for the 120-volt feed.20 That's work you can offer them. If you hold only Telecommunications, Low Voltage, note that the carve-out names the electrical classification, and ask the Fire Marshal's licensing section before you rough in alarm devices.

Solar

Solar takes its own license. "A Solar Energy Equipment license shall be required to install solar energy equipment or solar energy systems for which the project value is ten thousand dollars or more," and you can only add it on top of Electrical, Building Construction, Mechanical or Residential Construction. The same section says "an Electrical license is required to connect wiring or hookups for any photovoltaic panel or system" from $10,000, and it also covers companies that sell or lease solar.3,10 The utility needs an interconnection agreement before the system connects: Entergy's standards require one "before the Customer connects an electrical generator directly to the distribution system or to a building," and list solar among the generators.27

Lead paint in pre-1978 houses

Cutting into painted walls in a house built before 1978 is renovation under EPA's lead rule. Louisiana isn't on EPA's list of states that run their own program, so the federal rule applies directly, and it covers "all firms, even sole proprietorships."31 You need firm certification and a certified renovator unless the job disturbs "6 square feet or less of painted surface per room" inside, or 20 outside, and jobs in the same room within 30 days count as one.31 A rewire that fishes through every room of an old house passes that line quickly.

Taking the whole job as the prime contractor

On a job that needs a license, "the licensee shall hold the classification for the majority of work performed."5 You can be the prime on a $40,000 lighting retrofit. You can't be the general contractor on a $90,000 tenant build-out where the electrical is a third of the work. In April 2026 the board accepted a no-contest plea from a Sulphur solar and electrical company on that rule and on a count of contracting with an unlicensed contractor.15

One open question: house jobs of $7,500 or more

The law exempts "electrical, mechanical, and plumbing licensees who are acting exclusively within the scope of their classification" from the licensing law. Act 757 of 2026 is easy to read as repealing that line: its Section 2 says "R.S. 37:2157(A)(19) is hereby repealed," and (19) is where the exemption sat. Read with its struck and underlined coding, though, Section 1 strikes the text of the old (18) and only the number "(19)," so the exemption moves up to become (18), and the digest describes no removal of it.4 On my reading it survives, renumbered. The registration that matters here is the home improvement one. It covers "repair, modernization, conversion, improvement" of a house at $7,500 or more, and the board's FAQ names only commercial licensees with Building Construction as exempt from it (Act 757 has since removed that exemption).1,14 If the trade exemption stands, house wiring inside your Electrical classification stays out of the registration. I don't know how the board reads it: the law book it published after the act still prints the old numbering. If you do house work, email the board before you sign a $7,500 house job and keep the answer. The registration itself means a $25,000 net worth, $500,000 of liability insurance and workers' comp.2,13

Louisiana electrical permits, inspections and the utility

The code and who enforces it

Every parish and city enforces the state's uniform construction code, through its own building code enforcement officers or certified third-party providers.21 The electrical part is the 2020 National Electrical Code with Louisiana amendments. The state's code council published a notice in the August 20, 2026 Louisiana Register to move to the 2023 NEC, so watch for the effective date.21 The amendments a service electrician meets most:

  • 230.85: for one- and two-family homes, "all service conductors shall terminate in disconnecting means ... installed in a readily accessible outdoor location," labeled EMERGENCY DISCONNECT in white letters on a red background, at least 1/2 inch high.
  • 230.71: existing services that are renovated, altered or repaired may keep up to six disconnects.
  • 230.67: surge protection on dwelling services stays, with an exception for manufactured homes only.
  • 210.8(F): no GFCI required on HVAC equipment.
  • 702.2(D): permanently mounted home generators follow the manufacturer's instructions and get carbon monoxide alarms.

The outdoor disconnect is where service changes grow after the quote. An electrician on r/electricians: "Once I pull a permit for a new mast the local inspector will fail it unless the meter socket is brought up to current code with a disconnect" (r/electricians, May 2025). Price it into every Louisiana service change unless your inspector tells you otherwise.

Who pulls the permit

The contractor. Where the job needs a state license, a local building department "shall not issue a building permit to any person who does not hold an active license in the appropriate classification for the scope of work," and the board's staff may check every local permit list each month.7 Skipping a permit, starting before it's issued, "misrepresenting the value or scope of work" on it, and skipping inspections are all license violations.5 The big jurisdictions:

  • New Orleans: a permit "if you plan to install, repair, replace, or alter any electrical apparatus or equipment, except for the replacement of light bulbs and fuses," issued only to a Class A license holder. The fee is $40 plus $3 per new circuit plus $0.30 per amp of service, so a 200-amp service change with no new circuits is $100.22
  • Jefferson Parish: a parish-licensed electrician files before work starts, for panels, fixtures, fans, switches and outlets alike. Permanently installed backup generators also need a building permit.23
  • Baton Rouge (East Baton Rouge Parish): permits for "any new electrical circuits including replacements and extensions of existing circuits," for meters, disconnects and service equipment, and for generators and solar. No permit for replacing a light fixture, a switch or receptacle, or a breaker with one of the same size in the same spot, or for low-voltage wiring under 25 volts and 50 watts.24
  • Shreveport: the contractor's registration first; the city sends electrical contractors on jobs over $10,000 to the state license.25
  • Lafayette: the consolidated government's Permitting Division handles permits and licenses for the city and the unincorporated parish.26

The homeowner exemption

The licensing law doesn't apply to owners who take charge of work on "their personal residences" (building no more than one a year), with an affidavit for the permit.4 Whether that owner may pull an electrical permit is a local question, and in New Orleans the electrical permit goes only to Class A holders.22 Either way, the exemption covers the owner, never the electrician the owner pays.

The utility: no meter until the inspector signs off

Where an inspection is required, every utility I read waits for it. A service change means two calls, one to the inspector and one to the utility, and the second waits on the first.

  • Entergy (Entergy Louisiana and Entergy New Orleans): "The Company will schedule service connection after the authority having jurisdiction has notified the Company all required permits and inspections are passed and approved." On seals: "A licensed electrical contractor shall obtain approval prior to removing any meter seal, or notify the Company after doing so under emergency circumstances." Its Customer Installation Standards were revised in August 2026, and from January 2027 only the 2026 edition is accepted. Service for new residential construction goes through its Builder Service Request form, and a builder portal is coming; the builder page has a form to get on its contact list.27
  • Cleco: inspection "shall be completed and certificate of approval secured before the Company renders service," and "when an existing meter installation is disconnected, the installation shall be made compliant with current NEC standards prior to reconnection." Only "a duly authorized person" may break a seal.28
  • SWEPCO: the installation must "pass an electrical inspection before SWEPCO can complete the connection." Only SWEPCO-authorized personnel cut seals; in an emergency, "exceptions may be granted to qualified electricians by contacting SWEPCO," and you notify SWEPCO when the work is done.29
  • Lafayette Utilities System: new commercial service requests ask for the "name of the Owner/Developer’s electrical contractor or electrician," a riser diagram and a load summary.26
  • The co-ops: the seven members of the Association of Louisiana Electric Cooperatives are Beauregard Electric, Claiborne Electric, DEMCO, Jeff Davis Electric, Panola-Harrison Electric, South Louisiana Electric and Washington-St. Tammany Electric.30 Call each one you'll work in about service changes and seal approvals.

Then plan for the wait. "I have 3 underground service I need a disconnect/reconnect scheduled and I'm going on 2 months now with nothing" (r/electricians, August 2024). Book the utility the day the permit issues. And before you trench for an underground service or an EV run, follow the state's underground damage prevention law: ignoring it has been a license violation since August 2026.5

Can I take this job? A table for Louisiana Electrical and low-voltage license holders

The verdicts assume the value is counted the Louisiana way (labor plus all materials) and that "permit" means the local one. "Electrical" means the Electrical classification; "low voltage" means Telecommunications, Low Voltage.

JobVerdictThe rule behind it
Panel swap, same amperageYes, with a permitUnder $10,000 the state license isn't what makes it legal; the local one is (New Orleans Class A, a Jefferson Parish filing). Baton Rouge requires a permit to replace service equipment. The utility pulls the meter or approves the seal break.
200-amp service upgradeYes, with a permit and the utilityPlan for the outdoor emergency disconnect (NEC 230.85 as amended). Entergy, Cleco and SWEPCO connect only after the inspection passes, and Cleco requires a disconnected meter installation to meet current NEC before it reconnects.
EV charger circuitYes, with a permitA new circuit needs a permit in Baton Rouge and New Orleans. Follow the dig law before trenching. At $10,000 or more, the Electrical classification (low voltage alone doesn't cover it).
Standby generator with a gas hookupElectrical: yes, with a permit. Gas line: sub it outNatural gas piping takes a gas fitter license at any price; the hookup from the appliance shutoff valve isn't gas fitting. Propane takes an LP Gas Commission permit. A carbon monoxide detector goes in with every home generator. Jefferson Parish also wants a building permit.
Hot tub circuit and disconnectYes, with a permitThe circuit is electrical work. Installing the tub itself on a house over $7,500 belongs to the Residential Swimming Pools classification.
HVAC condenser circuitCircuit, disconnect and whip: yes, with a permit. The unit: sub it outMechanical classification from $10,000; a parish-licensed mechanical contractor files for AC equipment in Jefferson Parish; EPA 608 to open the refrigerant circuit. Louisiana drops the GFCI requirement on HVAC equipment.
Data, network or low-voltage cablingYes (Electrical or low voltage)Over $10,000 you need one of the two; Electrical applies whenever the work penetrates walls, ceilings or floors. Baton Rouge needs no permit under 25 volts and 50 watts.
Fire alarm, security or camerasRough-in and devices: yes. Panel termination and service: sub it outThe State Fire Marshal licenses the rest. The carve-out doesn't cover wireless systems.
Solar PV systemFrom $10,000: add Solar Energy Equipment first. Under $10,000: yes, with a permitSolar Energy Equipment license from $10,000; Electrical to connect PV wiring from $10,000; an interconnection agreement with the utility before it connects.
A job in another city or parishYes, after you register thereNo local exam for you or your crew, but local fees, licenses and permits apply: a Class A license in New Orleans, a filing in Jefferson Parish, a registration in Shreveport, and an occupational license where you're based or working.
A house rewire or remodel wiring, $7,500 to $49,999Ask the board in writing firstAct 757's wording reads like a repeal of the exemption for electrical licensees, but its coded text keeps it as R.S. 37:2157(A)(18). Without it, home improvement work from $7,500 needs a registration. See above.
A whole remodel or build-out, as the prime contractorOnly if electrical is most of the work"The licensee shall hold the classification for the majority of work performed." Otherwise you're the electrical sub.
Lighting or devices in a pre-1978 house, with wall cutsYes, with EPA lead-safe certification past 6 sq ft per roomEPA runs the lead rule directly in Louisiana.

Sources for the table: classifications and the $10,000 line,1,10,11 solar,3 the repealed exemption,4 majority of work and the dig law,5 local exams,2 gas and propane,17,18 carbon monoxide,19 alarms,20 the code,21 New Orleans, Jefferson Parish, Baton Rouge and Shreveport,22,23,24,25 the utilities,27,28,29 lead and refrigerant.31,32

What happens if you cross the line

The board

  • A fine "of up to ten percent of the total contract or the value of the work bid or being performed," up to $10,000 where no value can be set, plus "administrative costs and attorney fees for each offense."9 On a $40,000 job outside your classification, that's up to $4,000 before costs.
  • Cease-and-desist orders and court injunctions to stop the work. Anyone who keeps working after the board's notice can be barred from applying for a license for up to a year.9
  • Working "without possessing a license with the proper classification" is the same violation as working with no license.5
  • The board does hear electrical cases. Its violations list shows D & K Electric of Berwick (June 18, 2026) and Light It Up Electric of Lafayette (January 14, 2026) fined for bidding or working without the proper license, and MAK Electrical Contracting of Livingston (June 17, 2026) fined for contracting with an unlicensed contractor.15

Criminal charges

Contracting without a license is a misdemeanor: up to $500 a day, three months in prison, or both. Without a license and causing more than $300 of harm: $500 to $5,000, and six months to five years with or without hard labor.8

Getting paid

A contractor "who fails to obtain a license" can't file "a statement of claim or a statement of lien or privilege" for the money.6 The courts go further. The First Circuit held that "any contract made in violation of the Contractors Licensing Law is null and void," limited the contractor to its actual costs "with no allowance for profit or overhead," and, because the work was substandard, let it recover nothing. That contractor held a commercial license but not the classification the job needed.16

Insurance

The state sets no insurance minimum for your classification, so there's no state rule on what your insurer owes you for work outside it. That's in your policy. Ask your agent in writing whether it covers work outside your LSLBC classification and outside your local licenses, and keep the reply. Finding coverage is the hard part for many new shops: "The absolute hardest thing this time is the getting insurance thing. I’ve called like 7 or 8 local places" (r/electricians, August 2026).

Your first 30 days: the checklist

Everything is here. The printable version has the same items with blanks for your license, permit, policy and utility account numbers. Get it three ways: make your own copy in Google Docs (lands in your Drive), download the Word version (.docx), or download the PDF. Pick a format, enter your email and I'll send the links. Copies don't update, so its footer gives the date I checked the rules.

  1. Look yourself up. On the LSLBC contractor search, write down your license number, every classification, the qualifying party and the expiration date. Licenses expire on the anniversary of issue; at renewal you pick a one-, two- or three-year term. There's a 15-day grace period, then a delinquent fee of up to $50, and a license not renewed within a year is gone: you apply again.2
  2. Keep the entity in good standing. An LLC or corporation must stay active with the Louisiana Secretary of State as long as it's licensed, and an out-of-state company needs a certificate of authority to do business here.2,10
  3. Settle your qualifying party. An owner, or a W-2 employee working 32 hours a week or more. Know who would replace them. Changes to owners, officers, address, email, business structure or the qualifying party go to the board within 30 days.2,10
  4. Insurance and bond. The board sets no insurance minimum and no bond for Electrical or Telecommunications; its checklist says certificates are "Not required for Commercial Applicants/Licensees." Its financial test came at application: a $50,000 net worth on its form, or an irrevocable letter of credit to cover the gap.12,13 Your real minimums come from elsewhere. New Orleans requires general liability "not less than $500,000" and workers' comp, both naming the City as certificate holder (an affidavit if you have no employees). General contractors write their own minimums into subcontracts. And every employer in Louisiana must secure workers' comp.22,33
  5. Local licenses where you'll work. New Orleans: the Class A electrical license ($125 a year, renewed on your birthday, state license plus a qualifying-party letter, one per company), and an Orleans Parish occupational license or your out-of-parish one registered with the city's Department of Revenue. Jefferson Parish: before your first filing, ask the Building Permits department how a state licensee gets on its list of licensed electricians (its new-license and electrical exam forms are on its permit forms page), and get zoning clearance, then an occupational license from the Sheriff's Office. East Baton Rouge: an occupational license a month before you open ($50 in the first half of the year, $25 in the second). Shreveport: the contractor's registration. Lafayette: ask the Permitting Division.22,23,24,25,26
  6. The utilities. Entergy: fill in the builder contact form on its builder page, keep the Builder Service Request link, and download the August 2026 Customer Installation Standards. Cleco: the March 2026 Electric Service Standards. SWEPCO: the Builders & Contractors page and its electric service handbook. Plus Lafayette Utilities System and your co-ops. Ask each one three things: how to book a disconnect and reconnect for a service change, who approves breaking a meter seal, and how the inspection release reaches them.26,27,28,29,30
  7. Your license number and exact licensed name, everywhere. Every contract for licensed work must show "the full names, addresses, and the license number of the contractor."6 You bid and work "in the name as it appears on the current license," and the board "does not recognize DBA’s."2,14 I found no statewide rule requiring the number on trucks or ads. The law does forbid "a misleading or false claim related to a person’s license status or classification in any medium," so list the classification you actually hold.5,8
  8. Add what you'll need. Solar Energy Equipment before a $10,000 solar job. Classifications are added by application, exam where required, and board approval.2,3
  9. Line up the trades you sub to, and look each one up. A licensed gas fitter, a mechanical contractor, a Fire Marshal-licensed alarm firm, a plumber. Contracting with an unlicensed contractor is a violation for you.5
  10. Ask the board about house jobs from $7,500 if you do residential work, and keep the answer (the open question above).
  11. Pre-1978 houses: EPA firm certification and a certified renovator before you cut more than 6 square feet of painted wall in a room.31
  12. Records. Keep five years of contracts, subcontracts and sub licenses. The law gives you five business days to produce them when the board asks (its older rule says 72 hours).2,10
  13. Calendar. Your LSLBC renewal date; your New Orleans renewal on your birthday (a license lapsed two years means retesting there). The board requires no continuing education for commercial classifications. Watch for the 2023 NEC effective date.14,21,22
  14. Based outside Louisiana? The Department of Revenue's rule still requires nonresident contractors to register each contract over $3,000 and post a bond before getting a building permit, but the statute it cites, R.S. 47:9, was repealed effective December 4, 2024. Call the department before your first permit.34

More for new electrical contractors

Where Deepsel fits

Deepsel is the field service software I build, and it doesn't know Louisiana licensing. It won't warn you when a quote reaches $10,000, it won't track your city licenses or renewal dates, and it doesn't pull permits or book the utility. What it does: the shop-wide terms text you set once is copied onto every quote and shows on the customer's quote page, and the invoice footer is copied onto every invoice, so your LSLBC number, classification and licensed name go on every document without retyping. You can attach checklists to a quote for the office and techs to fill in (permit number, inspection date, utility release), each answer stamped with who and when; they stay internal and never show on the customer's page. Quotes can carry options, the customer approves and signs on screen, and an optional card deposit is credited on the final invoice. Free covers 30 estimates and 30 invoices a month for your whole team, with scheduling and dispatch, quotes, invoicing, card payments, and customer and equipment records; Pro is $29 a month with unlimited estimates and invoices (pricing).

Free up to 30 estimates and 30 invoices a month, then $29 a month for your whole team. No credit card required.

Frequently asked questions

Does Louisiana have a state electrical license?

For the business, yes: the State Licensing Board for Contractors (LSLBC) issues the Electrical classification, which a company needs for electrical work worth $10,000 or more, labor and materials together, on homes and commercial buildings alike. For people, no: there is no statewide master or journeyman electrician license. New Orleans, Jefferson Parish, Shreveport and other cities and parishes license or register electricians themselves, and state law lets them, though it exempts statewide-licensed electrical contractors and their employees from local exams.

Is a contractor license required in Louisiana for electrical work?

From $10,000 of electrical work on one project, yes, and the project value counts labor and every material whoever buys them. Splitting a job into smaller contracts doesn't avoid it. Below $10,000 the state asks for nothing, but the city or parish usually does: New Orleans issues electrical permits only to holders of its Class A license, and Jefferson Parish requires a parish-licensed electrician to file for panels, fixtures, fans, switches and outlets.

What insurance does a Louisiana electrical contractor license require?

None from the state. The LSLBC's own checklist says certificates of insurance are 'Not required for Commercial Applicants/Licensees,' and the Electrical classification sits on the commercial license. The $500,000 liability minimum that took effect August 1, 2026 applies to residential, home improvement and mold licenses. New Orleans is different: its Class A electrical license requires general liability of at least $500,000 and workers' compensation, with the City listed as certificate holder. Any employer in Louisiana must secure workers' comp.

Can I work in New Orleans with my state electrical license?

Yes, after you get the city's Class A electrical license. State law excludes statewide-licensed electrical contractors from local exams, and New Orleans accepts a copy of your state license and a qualifying party letter in place of its ICC exam. The license costs $125 a year, renews on your birthday, needs $500,000 of general liability and workers' comp, and the city allows one Class A holder per company. Only a Class A holder can pull an electrical permit there.

Does the Telecommunications, Low Voltage classification let me do line-voltage work?

Not on jobs of $10,000 or more. Telecommunications, Low Voltage is a subclassification of Electrical covering 'all low voltage electrical applications,' with no exam. Line-voltage work at $10,000 or more needs the Electrical classification itself. Under $10,000, the local electrical license rules decide. Fire alarm, security, camera and access control work also needs a State Fire Marshal license whatever the dollar amount.

What electrical code does Louisiana use?

The 2020 National Electrical Code with Louisiana amendments, enforced by every parish and city through its own inspectors or certified third-party providers. The amendments include the outdoor emergency disconnect for one- and two-family homes with red labels and white letters, no GFCI requirement on HVAC equipment, and carbon monoxide alarms with permanently mounted home generators. The state's code council published a notice on August 20, 2026 to adopt the 2023 NEC.

Do I need a separate license to install fire alarms or security systems in Louisiana?

Yes, from the State Fire Marshal, for anything past rough-in. A firm holding the LSLBC electrical classification may install wire, conduit, boxes, fire alarm initiating and notification devices, intrusion alarm, camera and special locking systems without one. Final termination in the control panel, and certifying, inspecting or servicing the system, take a Fire Marshal license. The carve-out doesn't cover wireless systems.

Sources

  1. La. R.S. 37:2150.1, definitions: (4) "Contract" (project value "includes the entire cost of the labor, materials, rentals, and all direct and indirect project expenses ... regardless of who pays the costs"), (8) "Electrical contractor" ("any residential, commercial, or other project, for which the project value is ten thousand dollars or more"), (12) "Home improvement" ($7,500 or more), (13) "Home improvement contractor," (16) "Mechanical contractor" ($10,000 or more, including gas piping). LSLBC, "Contractors Licensing Law and Rules and Regulations," updated 8/1/2026, pp. 3-6, lslbc.gov; the legislature's page (history through Acts 2025, No. 422), legis.la.gov. Read November 3, 2026.
  2. La. R.S. 37:2156 (C) fees, (F) work only within your classification and in the licensed name, (G) adding classifications, (H) expiration on the anniversary, one- to three-year terms, 15-day grace, delinquent fee, (J) no renewal after a year, (M) Secretary of State certificate of authority, (N) local competency licenses for "mechanical, electrical, or plumbing contractors"; 37:2156.1 (B)(2) net worth $50,000 commercial and residential, $25,000 home improvement, (E) qualifying party (principal or full-time employee; 30 days to notify, 60 to replace), (F) $500,000 liability for residential, mold and home improvement only, (I) statewide-licensed electrical contractors and their employees excluded from local examination and certification; 37:2156.2(A) records kept five years, produced within five business days. LSLBC law book updated 8/1/2026, pp. 11-16, lslbc.gov. Read November 3, 2026.
  3. La. R.S. 37:2156.3, solar energy equipment and systems: Solar Energy Equipment license at $10,000 or more; applicant must hold Building Construction, Electrical, Mechanical or Residential Construction; "An Electrical license is required to connect wiring or hookups for any photovoltaic panel or system" at $10,000 or more; applies to sellers and lessors. LSLBC law book updated 8/1/2026, pp. 16-17, lslbc.gov. Read November 3, 2026.
  4. La. R.S. 37:2157(A) exemptions: (12) "Any employee of any licensee," (13) owners of their personal residences, one a year, with an affidavit, (15) exemptions from home improvement licensure, (19) "Electrical, mechanical, and plumbing licensees who are acting exclusively within the scope of their classification," as printed in the LSLBC law book updated 8/1/2026, p. 19. Act 757 of 2026 (SB 326), effective August 1, 2026: Section 1 (enrolled page 15) strikes the text of the old (18) and the number "(19)," leaving this exemption unstruck as the new (18); Section 2: "R.S. 37:2157(A)(19) is hereby repealed," legis.la.gov; Résumé Digest (local competency licenses: "adds electrical contractors to the exception"; building construction licensees lose the home improvement exemption; amends 2157(A)(18), repeals (A)(19), and describes no removal of the trade exemption), legis.la.gov. Read November 3, 2026.
  5. La. R.S. 37:2158(A): (1) work without a license "or without possessing a license with the proper classification," (2) misleading or false claims about license status "in any medium," (4) "the licensee shall hold the classification for the majority of work performed," (7) contracting with an unlicensed contractor, (8)(a) "Permitting a license to be used for any purpose by any person other than the person to whom the license is issued," (18) permits and "misrepresenting the value or scope of work," (19) inspections, (24) the Louisiana Underground Utilities and Facilities Damage Prevention Law, R.S. 40:1749.11 et seq.; (B)(1) divided contracts treated as one. LSLBC law book updated 8/1/2026, pp. 19-21, lslbc.gov. Read November 3, 2026.
  6. La. R.S. 37:2159(A)(2) (contracts for licensed work show "the full names, addresses, and the license number of the contractor") and (D) (no statement of claim, lien or privilege for a contractor "who fails to obtain a license"). legis.la.gov, read November 3, 2026.
  7. La. R.S. 37:2160(A) (board staff may inspect local permit lists monthly), (B) (no building permit without "an active license in the appropriate classification for the scope of work"), (D) (the chapter preempts "any municipal or other local regulatory examination authority over all licensees"). LSLBC law book updated 8/1/2026, p. 24, lslbc.gov. Read November 3, 2026.
  8. La. R.S. 37:2163(A)(2) (misleading or false license claims "in any medium") and (C) (misdemeanor, up to $500 a day, three months, or both; $500 to $5,000 and six months to five years where an unlicensed person causes harm over $300). legis.la.gov, read November 3, 2026.
  9. La. R.S. 37:2164 (A) fine "of up to ten percent of the total contract or the value of the work bid or being performed," up to $10,000 where no value can be determined (Act 757), plus administrative costs and attorney fees; (C)-(G) cease-and-desist orders and injunctions; (H) up to one year's ineligibility after failing to cease work. legis.la.gov and LSLBC law book updated 8/1/2026, pp. 25-27. Read November 3, 2026.
  10. LSLBC rules, LAC 46:XXIX, in the law book updated 8/1/2026, pp. 28-43: §105(C) (business entities stay active with the Secretary of State), §107 (changes reported within 30 days), §109 (qualifying party: full-time employee "working at least 32 hours per week"; work in the classification may not begin until a departed qualifying party is replaced), §125 (the license belongs to the licensee), §129 (records for five years, produced within 72 hours), §301(B) (a major classification covers its subclassifications), §301(F)(14) Electrical ("provided the value exceeds $10,000"; low voltage that penetrates walls, ceilings, floors or the envelope), (15) Electrical Controls, Instrumentation and Calibration, (16) Electrical Transmission Lines, (51) Residential Swimming Pools (over $7,500, includes hot tubs), (54) Solar Energy Equipment, (57) Telecommunications, Low Voltage, §309 (majority of the work). lslbc.gov, read November 3, 2026.
  11. LSLBC classification pages: "Electrical" (released August 8, 2025), lslbc.gov; "Telecommunications, Low Voltage" ("All low voltage electrical applications. No examination or credential is required. A license is required when the value exceeds $10,000. Telecommunications is a subclassification of Electrical."), lslbc.gov. Read November 3, 2026.
  12. LSLBC, "Checklist of Items Required for Initial License and to Maintain License": certificates of insurance "Not required for Commercial Applicants/Licensees"; $500,000 general liability and workers' compensation for residential and home improvement; qualifying party must complete the Business & Law course; eligible qualifying parties. lslbc.gov, read November 3, 2026.
  13. LSLBC, Financial Statement form, revised 09/10/2025: net worth minimum "All Residential and Commercial (except for Labor Only) Applicants - $50,000.00"; home improvement, mold remediation and labor only $25,000; an irrevocable letter of credit may satisfy the requirement. lslbc.gov, read November 3, 2026.
  14. LSLBC, "FAQ": "There are no continuing education requirements for commercial, mold, or home improvement contractors/registrants"; "Only those who hold a commercial license with the classification of 'Building Construction' are exempt from a Home Improvement Registration" (written before Act 757); "LSLBC does not recognize DBA’s, Assumed Names or Fictitious Names." lslbc.gov, read November 3, 2026.
  15. LSLBC, "Contractor Violations" database: D & K Electric, Inc., Berwick, June 18, 2026, "Bidding or conducting work without the proper license," fines and costs assessed; MAK Electrical Contracting, LLC, Livingston, June 17, 2026, "Contracting with an unlicensed contractor," fines and costs assessed; Groundup Solar & Electrical LLC, Sulphur, April 16, 2026, no contest plea accepted on 2158(A)(7) and (A)(4); Light It Up Electric LLC, Lafayette, January 14, 2026, "Bidding or conducting work without the proper license," found guilty, fines and costs. lslbc.gov, read November 3, 2026.
  16. Quaternary Resource Investigations, LLC v. Phillips, 2018 CA 1543 (La. App. 1 Cir. 11/19/20), 316 So.3d 448: "Any contract made in violation of the Contractors Licensing Law is null and void"; recovery limited to actual costs "with no allowance for profit or overhead," denied for substandard work; the contractor held a commercial license, not the residential classification. law.justia.com, read November 3, 2026.
  17. State Plumbing Board law: La. R.S. 37:1366(J)(2) (gas fitter license), justia.com; 37:1377(K) ("Gas fitting"; excludes "piping connection, disconnection, or reconnection from the outlet side of the appliance shutoff valve to the appliance inlet," and LP Gas Commission licensees), justia.com; 2025 versions. Act 908 of 2026 (HB 953): "any plumbing work of any kind" requires a plumber's license; repeals R.S. 37:1361-1380; effective January 1, 2027, legis.la.gov. Read November 3, 2026.
  18. La. R.S. 40:1847(A)(1): a permit or registration from the Liquefied Petroleum Gas Commission is required to install LP gas storage tanks or systems or LP gas appliances; the registration "applies only to plumbers who hold a masters plumber's license ... or mechanical contractors." legis.la.gov, read November 3, 2026.
  19. La. R.S. 40:1581(C): "Professional installers who install generators in one- or two-family dwellings shall include with installation of a home generator, at minimum, an operable carbon monoxide detector with a long-life, sealed battery." legis.la.gov, read November 3, 2026.
  20. La. R.S. 40:1664.3(50) ("Life safety and property protection contracting"; (b) licensees "shall not install primary power sources of one hundred volts or greater" for low-voltage systems unless licensed by the LSLBC), 2025 version, justia.com; 40:1664.4(A) (Fire Marshal license required), legis.la.gov; 40:1664.5.1 ("Limited exemption to licensure; electrical contractors," Acts 2020, No. 339), legis.la.gov. Read November 3, 2026.
  21. Louisiana Uniform Construction Code Council, "Uniform Construction Code Law and Rules and Regulations," May 20, 2026: R.S. 40:1730.23(A) (municipalities and parishes enforce through building code enforcement officers or certified third-party providers); LAC 17:I.107 (2021 IRC without its electrical part); LAC 17:I.115 (National Electric Code, 2020 Edition, with Louisiana amendments to 210.8(F), 230.67, 230.71, 230.85 and 702.2(D)), lsuccc.la; "2023 NEC & 2024 I-Code Adoption" (Notice of Intent published in the August 20, 2026 Louisiana Register), lsuccc.la. Read November 3, 2026.
  22. City of New Orleans: Class "A" Master Electrical License (state exam accepted with "State License (Statewide) and qualifying party letter"; general liability "not less than $500,000" and workers' compensation with the City as certificate holder; one Class A holder per company; $125 a year; expires on the holder's birthday), nola.gov; Trade License Application (Classes A, C, D and E; lapsed two years requires retesting; out-of-parish occupational licenses registered with the Department of Revenue), nola.gov; Electrical Permit (required for any electrical apparatus or equipment except bulbs and fuses; Class A holders only; $40 plus $3 per new circuit plus $0.30 per service amp; $40 per sign), nola.gov; Occupational License ("required if you will be conducting any business in Orleans Parish"), nola.gov. Read November 3, 2026.
  23. Jefferson Parish: Building Regulatory Division ("A licensed electrician is required to perform any electrical work with the issuance of an electrical filing"), jeffparish.gov; FAQ (electrical, mechanical and plumbing filings; permanently installed generators need a building permit; zoning clearance before an occupational license with JPSO), jeffparish.gov; Building Permits Forms (contractor license, electrical exam and electrical filing forms; license renewals moving to birthdates), jeffparish.gov. Read November 3, 2026.
  24. City of Baton Rouge Permit & Inspection Division, "Understanding Permit Requirements" (permits and exemptions for electrical work), brla.gov; Occupational License Tax ("New businesses must obtain their occupational license one month prior to opening"; $50 or $25), brla.gov. Read November 3, 2026.
  25. City of Shreveport, "Contractor’s Registration" ("Any unregistered person or contractor wishing to perform air conditioning / heating, electrical, and/or plumbing within the City of Shreveport must have a contractor’s registration"). shreveportla.gov, read November 3, 2026.
  26. Lafayette Consolidated Government, "Business Permits and Licenses" (Permitting Division for the city and unincorporated parish), lafayettela.gov; Lafayette Utilities System, FAQ on electrical service for a new business, lus.org. Read November 3, 2026.
  27. Entergy, "Builder services and standards" (Builder Service Request; new builder portal), entergy.com; "Customer Installation Standards for Electric Service," August 2026 Revision 2 (only the 2026 edition accepted from January 2027; connection after the authority having jurisdiction reports permits and inspections passed; meter seals; interconnection agreement for customer generation including solar), entergy.com. Read November 3, 2026.
  28. Cleco Power, "Electric Service Standards," March 2026, §7.18 (meter connection and seals) and §8.4 (inspection and approvals; reconnection to current NEC), cleco.com; Electric Service Standards page, cleco.com. Read November 3, 2026.
  29. SWEPCO, "Builders & Contractors," swepco.com; "Electric Service" handbook (2024) linked from "Requirements For Electrical Service" (inspections; removing and installing meters), swepco.com. Read November 3, 2026.
  30. Association of Louisiana Electric Cooperatives, "Members." alec.coop, read November 3, 2026.
  31. EPA, "Lead Renovation, Repair and Painting Program" (authorized states, Louisiana not among them; "all firms, even sole proprietorships"), epa.gov; 40 CFR 745.83 (minor repair and maintenance: "6 square feet or less of painted surface per room for interior activities or 20 square feet or less" outside; same room within 30 days is one job), law.cornell.edu. Read November 3, 2026.
  32. 40 CFR 82.161(a)(1): anyone "reasonably expected to violate the integrity of the refrigerant circuit" must pass an approved technician certification exam. law.cornell.edu, read November 3, 2026.
  33. La. R.S. 23:1168(A): "An employer shall secure compensation to his employees" by insurance or approved self-insurance. legis.la.gov, read November 3, 2026.
  34. Louisiana Department of Revenue, LAC 61:I.4373, Nonresident Contractors (contracts over $3,000 registered, $10 fee, surety bond of 2.5% or 5% of the contract or $1,000, before a building permit), law.cornell.edu; La. R.S. 47:9, "Repealed by Acts 2024, 3rd Ex. Sess., No. 11, §4, eff. Dec. 4, 2024," justia.com. Read November 3, 2026.

Know your $10,000 line. Then run the shop on Free.

Put your LSLBC number, classification and licensed name in your quote terms once and they go on every quote. Deepsel Free covers 30 estimates and 30 invoices a month for your whole team, with quotes customers sign on screen, card deposits and invoicing. Pro is $29 a month for unlimited estimates and invoices. No card required.

Start free
Questions? Email me: tim@usedeepsel.com

Get the template by email

Enter your email and I'll send you the download links for every format of this template.